Scaffold

scaffold

An investigation of the failure of a temporary scaffolding structure in high winds. Again, this involved interpretation of the British Standard for Wind Loading (which does not specifically cover this type of structure), visits to site, calculations of wind speed from meteorological data and some wind tunnel testing to confirm the failure mode and failure wind speeds. This culminated in the preparation of a report detailing our considered view on the likely sequence of events and the contributory factors leading to failure. This case did go to court on a Health & Safety prosecution and expert witness evidence was given.

BEGIN MAIN MENU
END MAIN MENU
BEGIN HOME MENU
END HOME MENU
BEGIN SUPPORT MENU
END SUPPORT MENU

Copyright © RWDI Anemos Limited

RWDI Anemos Limited is in alliance with the RWDI Group of Companies.

Accessibility Statement.

RWDI Anemos Limited, Registered Office:
SA LAW, 60 London Road, St. Albans, Hertsfordshire, AL1 1NS,
registered in England and Wales No. 4316617

We are an ISO 9000 registered firmwe are a full member of the A C E