St. Pancras
RWDI Anemos was commissioned by the cladding contractor to advise on the correct design pressures to use for the cladding on the major redevelopment of St Pancras station in preparation for the completion of the Channel Tunnel Rail Link. This complex structure required careful and detailed interpretation to ensure that the code provisions, which are designed for more straightforward rectangular form buildings, were correctly applied. Advice was provided for several areas of external cladding and for suspended ceilings in an entranceway to the station. |
Copyright © RWDI Anemos Ltd. | Accessibility Statementjump to top of page ![]() RWDI Anemos is a member of the RWDI Group of Companies |